Active Jobs
21-002
Ridgeline Builders: Pergola
Iron
1.7 / 145 hours (1.2%)
Design
31 feet.
21-020
Brightwater Commons: Spiral Stair
Bronze
41.9 / 106 hours (39.5%)
Design
21-004
Quill & Ink Bookshop: Window Guards
Aluminum
5.4 / 102 hours (5.3%)
Drawing Approval
21-023
Old Mill Lofts: Balcony Railing
Aluminum
12.5 / 94 hours (13.3%)
Drawing Approval
24 feet.
21-019
Old Mill Lofts: Canopy
Aluminum
18.7 / 115 hours (16.3%)
Material Ordered
21-030
Delacroix Residence: Handrail
Aluminum
37.3 / 68 hours (54.9%)
Material Ordered
17 feet.
21-025
Copperleaf Winery: Fence
Steel
78.9 / 103 hours (76.6%)
Fabrication
17 feet.
19-004
Old Mill Lofts: Handrail
Steel
92 / 120 hours (76.7%)
Finishing
17 feet.
21-027
Ashby Residence: Sign Bracket
63 / 163 hours (38.7%)
Finishing
48 feet.
Unknown material
20-024
Pemberton Residence: Pergola
Iron
131.9 / 154 hours (85.6%)
Ready to Install
24 feet.
21-006
Ortega Residence: Driveway Gate
Aluminum
77.8 / 79 hours (98.5%)
Ready to Install
17 feet.
21-009
Bluegate Apartments: Spiral Stair
Bronze
84.4 / 111 hours (76%)
Ready to Install
66 feet.
21-014
Halvorsen Residence: Sign Bracket
Steel
129.6 / 173 hours (74.9%)
Ready to Install
31 feet.
21-031
Harbor Street Bistro: Pergola
Steel
112.6 / 109 hours (103.3%)
Ready to Install
48 feet.
21-003
Corvid Coffee Roasters: Spiral Stair
Steel
173 / 161 hours (107.5%)
Punch List
12 feet.
21-012
Corvid Coffee Roasters: Spiral Stair
Steel
91.8 / 128 hours (71.7%)
Punch List
21-017
Ortega Residence: Canopy
Steel
90.4 / 78 hours (115.9%)
Punch List
31 feet.
21-021
Halvorsen Residence: Sign Bracket
Iron
65.8 / 69 hours (95.4%)
Punch List